Gateway Trail Connector Construction
Proposal is to construct about 200 feet of non-motorized trail and a foot bridge on the south side of the highway in lower Logan Canyon to connect Logan City's Gateway Trail to the Riverside Trail (#603) located on National Forest.
Project Summary
Location Summary:
South side of Highway 89 in lower Logan Canyon on the Logan Ranger District
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/15/2012 |
| Comment Period | 05/15/2012 |
| Decision | 06/2012 (Estimated) |
| Implementation | 06/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Logan Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Completed
Project Decision Information
Gateway Trail Connector Construction
Decision Signed Date: 06/15/2012
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Logan Ranger District
States:
Utah
Counties:
Cache
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kelli Taylor
1500 East Highway 89
Logan, UT 84321
435-755-3626
ktaylor02@fs.fed.us
Last Updated: 9/28/2012