Skip to main content

Wadsworth Canyon water line SUP.

To sleeve an existing clay pipeline with new PVC smaller diameter pipe located in Wadsworth Canyon. There will be no change to the diversion structure. It is required for continued operation of the pipeline. Permit would be re-issued for 20 years.

Project Summary

Last Updated: 12/31/2012