Strawberry River Restoration
The project will encompass 4.7 miles of river, and a variety of fixes will be done like: removal of old non-functioning structures, addition of more suitable bank stabilization structures, sloping and stabilization of banks and re-vegetation.
Project Summary
Location Summary:
The project is located in the Heber-Kamas RD.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/20/2012 |
Comment Period | 12/01/2012 |
Decision | 02/2013 (Estimated) |
Implementation | 03/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Heber-Kamas Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Watershed Management; Wildlife, Fish, Rare Plants
Project Activity:
Species Habitat Improvements; Species Population Enhancements; Watershed Improvements
Current Status:
Completed
Project Decision Information
Strawberry River Restoration
Decision Signed Date: 02/04/2013
Legal Notice Date: 02/08/2013
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Heber-Kamas Ranger District
States:
Utah
Counties:
Wasatch
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kellie Whitton
2460 South Highway 40
Heber City, UT 84032
435-654-7232
kswhitton@fs.fed.us
Last Updated: 2/12/2013