Josephine Mining Claim.
This proposal is to excavate a portal of a cave in order to restore natural ventilation to another nearby cave. Once access to the cave is restored, exploration will take place to determine if Columbian Grade Emeralds exist.
Project Summary
Location Summary:
The project os located in the Heber-Kamas Ranger District.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/20/2012 |
Comment Period | 12/01/2012 |
Decision | 02/2013 (Estimated) |
Implementation | 04/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Heber-Kamas Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Josephine Mining Claim
Decision Signed Date: 02/04/2013
Legal Notice Date: 02/08/2013
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Heber-Kamas Ranger District
States:
Utah
Counties:
Summit
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jim Percy
2460 South Highway 40
Heber City, UT 84032
435-654-0470
jpercy@fs.fed.us
Last Updated: 2/12/2013