NEON Research Project
NEON is requesting a short-term permit (1-year) for access and to conduct preliminary geotechnical analysis in Red Butte Canyon, a Forest Service Research Natural Area (RNA).
Project Summary
Location Summary:
The project is located in the Salt Lake Ranger District
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/18/2013 |
Comment Period | 04/07/2013 |
Decision | 05/2013 (Estimated) |
Implementation | 05/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Salt Lake Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Research
Project Activity:
Research And Development
Current Status:
Completed
Project Decision Information
DM for NEON Observatory Red Butte Canyon Tower Site: Preliminary Geotechnic
Decision Signed Date: 05/09/2013
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Salt Lake Ranger District
States:
Utah
Counties:
Salt Lake
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Steve Scheid
6944 South 3000 East
Cottonwood Heights, UT 84212
801-733-2689
sscheid@fs.fed.us
Last Updated: 6/24/2013