Bountiful City Water System
Mill Creek Water Division Facility Reconstruction - Bountiful City is proposing to reconstruct their existing water diversion facility with a similar but slightly smaller structure.
Project Summary
Location Summary:
The location is approximately 1.0 mile above the gate to the Mueller Park Picnic Area.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/18/2013 |
Comment Period | 04/07/2013 |
Decision | 06/2013 (Estimated) |
Implementation | 06/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Salt Lake Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
DM Bountiful City:Mueller Water System Special Use Permit Authorization
Sp
Decision Signed Date: 06/18/2013
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Salt Lake Ranger District
States:
Utah
Counties:
Salt Lake
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jack Vanderberg
6944 South 3000 East
Cottonwood Heights, UT 84212
801-733-2671
jvanderberg@fs.fed.us
Last Updated: 6/24/2013