Orem City Alta Springs / Provo Canyon Water Line Replacement
The City of Orem is proposing to reconstruct an existing water transmission line across National Forest System lands (NFS). The reconstruction line would be place in the same location and covered with existing native material.
Project Summary
Location Summary:
The project is located in the Pleasant Grove Ranger District.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/07/2013 |
Decision | 05/2014 (Estimated) |
Implementation | 06/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pleasant Grove Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Orem City Alta Springs / Provo Canyon Water Line Replacement
Decision Signed Date: 05/12/2014
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Pleasant Grove Ranger District
States:
Utah
Counties:
Utah
Legal Land Description:
Section 33, Township 5 South, Range 3 East, Salt Lake Base Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Charles Rosier
390 North 100 East
Pleasant Grove, UT 84062
801-999-2159
crosier@fs.fed.us
Last Updated: 8/18/2014