Rocky Mountain Power Structure Install, Replacement, Phase Raising
Proponent proposes to do maintenance and install 3 new structures along the existing Naughton to Ben Lomond Power Line within their current right of way. The purpose of the project is to reduce slack in the line.
Project Summary
Location Summary:
Two sites approximately 8 miles and 25 miles northeast of Ogden, UT.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/07/2014 |
Decision | 10/2014 (Estimated) |
Implementation | 11/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Ogden Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Rocky Mountain Power Structure and Phase Raiser Maintenance PALS#45659
Decision Signed Date: 10/17/2014
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Ogden Ranger District
States:
Utah
Counties:
Weber
Legal Land Description:
T7N,R1W Sec 25, 26 and T8N,R4E Sec 13,14,15,22,21,30 Salt Lake Base and Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Anne Hansen
507 25th Street
Ogden, UT 84401
801-999-2158
annehansen@fs.fed.us