Skip to main content

Rocky Mountain Power Structure Install, Replacement, Phase Raising

Proponent proposes to do maintenance and install 3 new structures along the existing Naughton to Ben Lomond Power Line within their current right of way. The purpose of the project is to reduce slack in the line.

Project Summary

Last Updated: 10/20/2014