Allwest Communications Fiber Optic Line Upgrade
The Forest Service proposes to authorize Allwest Communications to upgrade an existing 525-foot section of copper line with 96-strand fiber optic line. The upgraded line would be installed along the existing copper line, which runs along Highway 150.
Project Summary
Location Summary:
Approximately 0.5 mile northwest of Samak along Highway 150.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/03/2017 |
Decision | 06/2017 (Estimated) |
Implementation | 06/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Uinta-Wasatch-Cache All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Allwest Communications Fiber Optic Line Upgrade
Decision Signed Date: 06/29/2017
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Heber-Kamas Ranger District
States:
Utah
Counties:
Summit
Legal Land Description:
Township 2 South, Range 6 East, Section 25.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Virginia Daniel
857 West South Jordan Parkway
South Jordan, UT 84095
435-783-4338
vdaniel@fs.fed.us
Last Updated: 7/18/2017