Dock Flat Pipeline
Proposal to construct a 2.25 mile pipeline connecting the Strawberry Extension Pipeline to a trough at Telephone Hollow. The pipe will be laid in a trench approximately 5 inches by 5 inches.
Project Summary
Location Summary:
Section 4, 9, 16, 21 Township 2 South, Range 12 West, USM
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/30/2016 |
Decision | 02/2017 (Estimated) |
Implementation | 05/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (9), 36 Cfr 220.6(E)(9)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Heber-Kamas Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Current Status:
Completed
Project Decision Information
Dock Flat Pipeline
Decision Signed Date: 02/28/2017
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Heber-Kamas Ranger District
States:
Utah
Counties:
Wasatch
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jim Percy
2460 South Highway 40
Heber City, UT 84032
435-654-0470
jpercy@fs.fed.us