Skip to main content

Hoy Hollow Pipeline

Proposal to replace the existing headbox and connect it to a 1.5 inch polypipe. The pipe will be laid on the ground and will carry water to two troughs just outside of the Chevron pipeline corridor.

Project Summary

Last Updated: 3/9/2017