Bountiful City Water System
Proposal to upgrade the deteriorating Bountiful City water treatment plant and associated infrastructure and connect it to the existing sewer located at the top of Muller Park day use site area.
Project Summary
Location Summary:
Bountiful, UT upper end of Muller Park Day Use
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/03/2017 |
Decision | 06/2017 (Estimated) |
Implementation | 07/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Salt Lake Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Bountiful City Water System
Decision Signed Date: 06/28/2017
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Salt Lake Ranger District
States:
Utah
Counties:
Salt Lake
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Pollyanna Bergseng
6944 South 3000 East
Cottonwood Heights, UT 84212
801-733-2686
pbergseng@fs.fed.us
Last Updated: 7/18/2017