Skip to main content

McPherson Water Development

Develop a spring for stock water use on the Nephi-Salt Creek Allotment. The water will be collected in a head box and delivered to two 1,200 gallon troughs via 100 feet of buried 1.5 inch diameter pipeline.

Project Summary

Last Updated: 9/25/2018