First Practice Wall Trail
Proposal to establish a class 2 trail (foot traffic only) to a popular climbing area (First Practice Wall), decommission existing social trails, and install an information sign.
Project Summary
Location Summary:
North side of Highway 89, Logan Canyon. Approximately 1.5 miles from the mouth of the canyon and east of Logan, Utah.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/01/2019 |
Decision | 06/2019 (Estimated) |
Implementation | 07/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Logan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Completed
Project Decision Information
First Practice Wall Trail
Decision Signed Date: 06/21/2019
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Logan Ranger District
States:
Utah
Counties:
Cache
Legal Land Description:
Township 12 North, Range 2 East, Section 30 Salt Lake Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Zachary Maughan
1500 East Highway 89
Logan, UT 84321
801-625-5392
zmaughan@fs.fed.us
Last Updated: 6/24/2019