Solitude to Brighton Aerial Fiber Line Installation and Power Pole Replacement
Proposal to install fiber optic line within the existing RMP powerline and replace two power poles within the current linear right of way in Solitude Area.
Project Summary
Location Summary:
Upper Solitude condominiums, following Pacificorp dba Rocky Mountain Power permitted power line linear right of way, terminating at Brighton Resort.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/02/2019 |
Decision | 12/2019 (Estimated) |
Implementation | 12/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Uinta-Wasatch-Cache All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
BCC Fiber DM
Decision Signed Date: 12/16/2019
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Salt Lake Ranger District
States:
Utah
Counties:
Salt Lake
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Larry Framme
857 West South Jordan Parkway
South Jordan, UT 84095
801-999-2155
larry.framme@usda.gov
Last Updated: 12/17/2019