Carter Creek Campground Well Replacement
Proposal from American Water Operations & Maintenance, LLC to drill a replacement groundwater well to replace the existing well at the Carter Creek Campground.
Project Summary
Location Summary:
Carter Creek Campground is located approximately 4 miles east of Highway 150 along the North Slope Road on the Evanston side of the Evanston-Mountain View Ranger District
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/02/2020 |
Decision | 07/2020 (Estimated) |
Implementation | 08/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Evanston-Mountain View RD
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Recreation Management
Project Activity:
Developed Site Management; Special Use Authorizations; Travel Management
Current Status:
Completed
Project Decision Information
Carter Creek Campground Well Replacement Decision Memo
Decision Signed Date: 07/27/2020
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Evanston-Mountain View RD
States:
Utah
Counties:
Summit
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Juan Barrientez
1566 Highway 150, Suite A
Evanston, WY 82930
801-625-5112
jbarrientez@fs.fed.us
Last Updated: 7/27/2020