Peruvian Ridge Explosives Magazine
The building is to be expanded 8ft to the North East along the 20ft length of the structure. The existing roof line will be maintained. The new expansion will be accessed via an interior man-door from the existing structure.
Project Summary
Location Summary:
On Peruvian Ridge within the special use permit boundary of Alta Ski Area.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/24/2020 |
Decision | 10/2020 (Estimated) |
Implementation | 10/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Uinta-Wasatch-Cache All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management; Special Use Management
Project Activity:
Developed Site Management; Special Use Authorizations
Current Status:
Completed
Project Decision Information
Peruvian Ridge Explosives Magazine
Decision Signed Date: 10/08/2020
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Salt Lake Ranger District
States:
Utah
Counties:
Salt Lake
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Arben Kraja
857 West South Jordan Parkway
South Jordan, UT 84095
(801) 733-2664
arben.kraja@usda.gov
Last Updated: 10/9/2020