Lower Muddy Spring Trough Relocation
Proposal to replace/relocate the existing Lower Muddy Spring Trough in Cedar Hollow. The primary purpose of this water development is to provide water to the allotment, which will improve livestock distribution.
Project Summary
Location Summary:
The project is located approximately 8 miles East of Francis, UT on Highway 35 and the junction of FS Road #202 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/09/2020 |
Decision | 11/2020 (Estimated) |
Implementation | 11/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (9), 36 Cfr 220.6(E)(9)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Heber-Kamas Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Current Status:
Completed
Project Decision Information
Lower Muddy Spring Trough Relocation Decision Memo
Decision Signed Date: 11/16/2020
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Heber-Kamas Ranger District
States:
Utah
Counties:
Wasatch
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Amber Helmus
2460 South Highway 40
Heber City, UT 84032
435-781-5205
ahelmus@fs.fed.us
Last Updated: 11/24/2020