Twin Creek Water System
Proposal to construct the Twin Creek pipeline (approx 0.81 miles) in its existing location with minor rerouting to avoid aspen groves. The pipeline will extend from the spring source to Twin Creek Corral with a spur to the rider camp.
Project Summary
Location Summary:
Approximately 20 miles northeast of Logan, UT, near Twin Creek Corral.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/25/2021 |
| Decision | 07/2021 (Estimated) |
| Implementation | 07/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (9), 36 Cfr 220.6(E)(9)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Logan Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Current Status:
Completed
Project Decision Information
Twin Creek Water System Decision Memo
Decision Signed Date: 07/08/2021
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Logan Ranger District
States:
Utah
Counties:
Cache
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Anthony Vonniederhausern
1500 East Highway 89
Logan, UT 84321
435-755-3620
avonniederhausern@fs.fed.us
Last Updated: 7/9/2021