Pineview Aerial Powerline Burial - Rocky Mountain Power
Rocky Mountain Power will convert overhead power lines to underground lines from the Forest boundary below Pineview Dam along Rt. 158 including lines to three recreation sites: Windsurfer Beach, Port Ramp Marina, and Ogden Pineview Yacht club.
Project Summary
Location Summary:
Along State Rt. 158 from just below Pineview Reservoir Dam, along west side of the reservoir, to the intersection with 2200 N, Eden, UT., approx. 375 ft.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/06/2022 |
Decision | 08/2022 (Estimated) |
Implementation | 08/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Uinta-Wasatch-Cache All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Completed
Project Decision Information
Pineview Aerial Powerline Burial - Rocky Mountain Power
Decision Signed Date: 08/15/2022
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Ogden Ranger District
States:
Utah
Counties:
Weber
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Larry Framme
857 West South Jordan Parkway
South Jordan, UT 84095
801-999-2155
larry.framme@usda.gov
Last Updated: 8/15/2022