Bullwinkle to Boardwalk Snowmaking Project, Snowbasin
Snowbasin Resort has proposed to install snowmaking equipment along the Boardwalk route between Bullwinkle run and the top of wildcat. The site will be accessed by existing roads and all materials will be transported via that road system.
Project Summary
Location Summary:
Snowbasin Ski Resort
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/23/2022 |
Decision | 09/2022 (Estimated) |
Implementation | 06/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Ogden Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
In Progress
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Ogden Ranger District
States:
Utah
Counties:
Weber
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christopher Sailor
507 25th Street
Ogden, UT 84401
530-350-0387
christopher.sailor@usda.gov
Last Updated: 8/31/2022