Maple Canyon Water Collection and Transmission Replacement
Project would replace the existing culinary water collection & transmission system in Maple Canyon to replace existing system. Project would temporarily affect Mapleton roadless area via overland equipment and truck access.
Project Summary
Location Summary:
Maple Canyon. Waterline runs from storage tank near the mouth of Maple canyon approx. 2 miles up canyon, with three forks in the system up sub canyons.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/06/2023 |
Decision | 08/2023 (Estimated) |
Implementation | 08/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Uinta-Wasatch-Cache All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Facility Management
Project Activity:
Special Use Authorizations; Facility Maintenance
Current Status:
In Progress
Forests:
Uinta-Wasatch-Cache National Forest
Districts:
Spanish Fork Ranger District
States:
Utah
Counties:
Utah
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Larry Framme
857 West South Jordan Parkway
South Jordan, UT 84095
801-999-2155
larry.framme@usda.gov
Last Updated: 7/6/2023