Skip to main content

South Oak Brush Pipeline Maintenance Project

To maintain the waterline, project would replace 4.6 miles of the South Oak Brush water transmission pipeline and redevelop two existing spring collection areas on the Vernon unit of the Spanish Fork Ranger District

Project Summary

Last Updated: 9/29/2023