Black Mountain Wireless Communication Facility
The project consists of site designation and construction/operation of a new multi-carrier cellular tower and building. Plans include a 70 foot lattice tower, a 49'4" by 17'4" equipment building, back-up generator and propane tank.
Project Summary
Location Summary:
Site is located on Black Mountain in the vicinity of Pyramid Lake on the east side of Interstate 5. The site is located adjacent to Posey Canyon Road.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/02/2017 |
| Decision | 08/2018 (Estimated) |
| Implementation | 09/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Angeles National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Black Mountain Wireless Communication Facility
Decision Signed Date: 08/17/2018
Forests:
Angeles National Forest
Districts:
Santa Clara/Mojave Rivers
States:
California
Counties:
Los Angeles
Legal Land Description:
T7N, R18W, NE Sec. 35, Black Mountain Quad
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Evalds Rimbenieks
701 N Santa Anita Ave.
Arcadia, CA 91006
661-269-2808 x 230
erimbenieks02@fs.fed.us
Last Updated: 9/27/2018