Skip to main content

SCIRP Highway 74

The primary focus of the project is to reduce the risk of ignition along the State Highway System. This document covers treatment only on NFS land adjacent to Highway 74 from milepost 12.7 to 16.6. FANEC was signed on 04/14/2026. Data was lost in ELMS after signature and had to be recreated.

Project Summary

Last Updated: 6/16/2026