SCIRP Interstate 8

The primary focus of the project is to reduce the risk of ignition along the State Highway System. Project is approximately 37.65 discontinuous acres between approximately postmile (PM) 35 and PM 48. FANEC was signed on 04/13/2026. Data was lost in ELMS after signature and had to be recreated.

Project Summary

Last Updated: 7/9/2026