Skip to main content

Descanso District Unauthorized Route Decommissioning 2014

Through this project, several unauthorized routes would first be ripped using an excavator to loosen compacted soil, reduce erosion, and enable vegetation to become established. Then, metal barriers would be installed to prevent their further use.

Project Summary

Last Updated: 3/31/2014