YMCA camp water pipeline and electrical conduit permit reissuance
Reissue permit for a water tank, water pipeline, and 4 inch electrical conduit extending from the vicinity of the Sherwin Creek Campground water main to the Mammoth YMCA camp. Eight foot right-of-way. Buried, in place since 2001.
Project Summary
Current Status:
Completed
Location Summary:
Between the Mammoth YMCA camp and the Sherwin Creek Campground, southeast of the town of Mammoth Lakes.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 11/01/2018 |
| Decision | 11/2018 (Estimated) |
| Implementation | 12/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Inyo National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
YMCA camp water pipeline and electrical conduit permit reissuance
Decision Signed Date: 11/08/2018
Forests:
Inyo National Forest
Districts:
Mammoth Ranger District
States:
California
Counties:
Mono
Legal Land Description:
T4S, R28E, Sections 6 and 7
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Andrea Kachulis
351 Pacu Lane
Bishop, CA 93514
760-924-5524
akachulis@fs.fed.us
Last Updated: 6/28/2019