Skip to main content

Los Angeles Department of Water and Power Rush Creek Return Ditch Road Improvements

LADWP is proposing to raise the embankment of the return ditch by approximately two feet for the full length of the ditch. The height would be raised by adding compacted fill on the road that parallels the ditch

Project Summary

Last Updated: 12/19/2016