Robbie Hoyt Memorial Mine - Exploration Plan of Operation
Robbie Hoyt Memorial Mine Exploration Plan of Operation located in Redding Canyon
Project Summary
Location Summary:
FS Road 7S127 and mining claim at 37.352 118.255 Township 7 South Range 34 East Section 9 SE 1/4
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/03/2017 |
Comment Period | 06/2017 (Estimated) |
Objection Period Start | 09/2017 (Estimated) |
Decision | 11/2017 (Estimated) |
Implementation | 01/2018 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
White Mountain Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Road Maintenance
Current Status:
Cancelled
Forests:
Inyo National Forest
Districts:
White Mountain Ranger District
States:
California
Counties:
Inyo
Legal Land Description:
FS Road 7S127 and mining claim at 37.352 118.255 Township 7 South Range 34 East Section 9 SE 1/4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Colleen Garcia
798 North Main Street
Bishop, CA 93514
760-873-2424
colleenggarcia@fs.fed.us
Last Updated: 7/18/2017