Verizon Generator Upgrade at Plowshare Peak Communication Site
Request for special use permit for replacement of back up power generator and fuel tank on existing concrete pad near an existing facility owned by American Tower Corp. at Plowshare Peak Communication Site.
Project Summary
Location Summary:
Plowshare Peak, Sierra Madre Ridge approximately 8 miles south of SH166 and 25 air miles NE of Santa Maria, CA
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 01/09/2012 |
| Decision | 01/2012 (Estimated) |
| Implementation | 03/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Santa Lucia Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Verizon Wireless Emergency Power Supply at Plowshare Communication Site
Decision Signed Date: 01/27/2012
Forests:
Los Padres National Forest
Districts:
Santa Lucia Ranger District
States:
California
Counties:
Santa Barbara
Legal Land Description:
Section 4, T11N, R30W, SBM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Vicki Collins
1616 Carlotti Drive
Santa Maria, CA 93454
805-961-5718
vcollins@fs.fed.us
Last Updated: 1/27/2012