NCW Tower Replacement at Black Mountain Communications Site
New Cingular Wireless proposes to replace their existing 60' tower with a new 80' tall 3-leg lattice tower. The existing equipment cabinet would be replaced with a new 11'x 25' building, and the existing generator and propane tank would be replaced.
Project Summary
Location Summary:
Approximately 14 miles east of Santa Margarita in San Luis Obispo County, CA
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/21/2021 |
Decision | 02/2022 (Estimated) |
Implementation | 11/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Santa Lucia Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
NCW Tower Replacement at Black Mountain Communications Site
Decision Signed Date: 02/17/2022
Forests:
Los Padres National Forest
Districts:
Santa Lucia Ranger District
States:
California
Counties:
San Luis Obispo
Legal Land Description:
T29S, R15E, Sec. 15, MDBM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Betz
1616 Carlotti Drive
Santa Maria, CA 93454
530-841-6131
dbetz@fs.fed.us
Last Updated: 3/14/2022