Skip to main content

Forest Route 4 Storm Damage Repair

Repair will include excavating slide material from Coon Creek, rebuilding road prism with keyed riprap and reinforced earth embankment, installing geocomposite drainage system, and resurfacing. The decision maker is Fed. Highways; cancel on SOPA.

Project Summary

Last Updated: 6/30/2011