34 - PacifiCorp(PPL) 230 KV Powerline Permit Reissuance
PPL has applied to reauthorize the permit for "Line 52", 19.5 miles by 125" ROW for power transmisssion. Line was originally authorized by the BIA in 1951
Project Summary
Current Status:
Completed
Location Summary:
Chiloquin Ranger District, north to south powerline, from near Oaxkanee Overlook south to near Dry Lakes
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/12/2006 |
| Decision | 07/2006 (Estimated) |
| Implementation | 09/2006 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Chiloquin Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Pacificorp (PPL) 230 KV Powerline Permit Issuance
Decision Signed Date: 07/27/2006
Forests:
Fremont-Winema National Forest
Districts:
Chiloquin Ranger District
States:
Oregon
Counties:
Klamath
Legal Land Description:
Townships 33, 34, 35, and 36 S, Ranges 7 and 8 E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kevin Moore
38500 Highway 97 North
Chiloquin, OR 97624
541-783-4039
krmoore@fs.fed.us
Last Updated: 8/7/2006