Dry Creek Juniper Reduction
The Forest is proposing to cut non-old-growth juniper in the Dry Creek water sub-shed to improve wildlife habitat in the Barry Point Fire area. Treatment techniques could include any or all: lop & scatter, piling, pile & cover, fire, removal.
Project Summary
Current Status:
Cancelled
Location Summary:
The project would be located within the Dry Creek water sub-sheds, within the Barry Point Fire boundary; between Dog Lake and Goose Lake.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/12/2017 |
| Decision | 08/2017 (Estimated) |
| Implementation | 09/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (6), 36 Cfr 220.6(E)(6)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakeview Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Vegetation Management (Other Than Forest Products); Wildlife, Fish, Rare Plants
Project Activity:
Forest Vegetation Improvements; Species Habitat Improvements
Forests:
Fremont-Winema National Forest
Districts:
Lakeview Ranger District
States:
Oregon
Counties:
Lake
Legal Land Description:
T40S, R17E, WM, Sec 25-27,34-36; T40S, R18E, WM, Sec 27-34; T41S, R17E, WM, Sec 1-3,10,11; T41S, R18E, WM, Sec 3-10.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jody Perozzi
18049 Hwy 395
Lakeview, OR 97630
541-353-2723
jperozzi@fs.fed.us
Last Updated: 10/25/2019