Midstate Pole Replacement
Midstate Electric needs to replace five 45-foot poles. All the poles will be replaced within the same spot except pole 96003 which will be moved over two feet. The work will be completed as soon as possible and will be finished within the same day.
Project Summary
Current Status:
Completed
Location Summary:
This project is located in the Silver Lake Ranger District, at T. 28 S., R. 14 E., W.M. sec 21., T. 29 S., R. 15 E., W.M. sec. 30 and 33, T. 30 S., R. 15 E., W.M. sec. 30.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/03/2022 |
| Decision | 07/2022 (Estimated) |
| Implementation | 07/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Silver Lake Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Midstate Pole Replacement
Decision Signed Date: 07/27/2022
Forests:
Fremont-Winema National Forest
Districts:
Silver Lake Ranger District
States:
Oregon
Counties:
Lake
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Ashley Philbeck
Highway 31
Silver Lake, OR 97638
541-947-6340
Ashley.Philbeck@usda.gov
Last Updated: 12/7/2022