Ninemile Fuel Break and Timber Stand Improvement Project
Create and maintain linear fuel breaks along system roads and improve timber stands. Width of the linear fuel breaks would be a maximum of 1000 feet combining both sides of the road. Improve timber stands by decreasing trees per acre and fuel loading
Project Summary
Current Status:
Cancelled
Location Summary:
The project area is five miles east by northeast form the city of Chiloquin. The project area is located north of Sprague River Highway and between Williamson River Road and Solomon Butte.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/30/2023 |
| Decision | 08/2025 (Estimated) |
| Implementation | 05/2026 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (6), 36 Cfr 220.6(E)(6); 32.3(11)
Special Authority:
2021 Infrastructure: Fuel Break Ce
Lead Management Unit:
Chiloquin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Vegetation Management (Other Than Forest Products); Fuels Management
Project Activity:
Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Forests:
Fremont-Winema National Forest
Districts:
Chiloquin Ranger District
States:
Oregon
Counties:
Klamath
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jade Souza
38500 Highway 97 North
Chiloquin, OR 97624
5417834058
Jade.Souza@usda.gov
Last Updated: 4/14/2025