Verizon Wireless - Grizzly Peak Communication Site
Consider request for SUP to intall an equipment shelter (26' x 11 1/2')on existing gravel pad, bury a powerline 120' through the graveled area and colocate antenna equipment on an existing tower at the Grizzly Peak Communications Site.
Project Summary
Location Summary:
Grizzly Peak
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/08/2014 |
| Decision | 10/2015 (Estimated) |
| Implementation | 03/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakeview Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Verizon Wireless - Grizzly Peak Project
Decision Signed Date: 10/08/2015
Forests:
Fremont-Winema National Forest
Districts:
Lakeview Ranger District
States:
Oregon
Counties:
Lake
Legal Land Description:
T38S, R18E, SESW section 19 Willamette Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jody Perozzi
18049 Hwy 395
Lakeview, OR 97630
541-353-2723
jperozzi@fs.fed.us
Last Updated: 12/9/2015