Pacific Power Batch 94 Pole Replacement Project
Pacific Power will replace an existing deteriorated distribution pole with a new pole within 5-feet of the existing pole being replaced. The project area will require minor clearing of brush, 50-feet by 50-feet around the pole being replaced.
Project Summary
Location Summary:
The project area is located approximately 3 miles south of the town of Chiloquin, OR.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/23/2024 |
Decision | 07/2024 (Estimated) |
Implementation | 09/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Chiloquin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Completed
Project Decision Information
Pacific Power Batch 94 Pole Replacement Project
Decision Signed Date: 07/24/2024
Forests:
Fremont-Winema National Forest
Districts:
Chiloquin Ranger District
States:
Oregon
Counties:
Klamath
Legal Land Description:
T. 35 S., R. 7 E., Sec. 15
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Guillermo Sereno
38500 Highway 97 North
Chiloquin, OR 97624
541-783-4061
guillermo.sereno@usda.gov
Last Updated: 7/26/2024