ERFO 4 Flood Damage Site Repairs

Stabilize FR 5270 from the December 2015 flood washout. Remove 6 culverts, construct control stream grade control structures, drainage, water bars, and closure barrier. Disturbed areas will be mulched and seeded. FR 5270 will remain a system road.

Project Summary

Last Updated: 8/17/2017