Snoqualmie District 2016 ERFO Road Repairs-NFS Road 50
Project to complete repairs of storm damage on NFS Road 50. Repairs would include embankment placement to grade to replace shoulder and roadway, including rock and root wad placement for bank stabilization, culvert cleaning, and road resurfacing.
Project Summary
Location Summary:
Cedar Mainline Road, National Forest System Road 50, at Mile Post 23.38
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/05/2018 |
| Decision | 05/2018 (Estimated) |
| Implementation | 05/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Snoqualmie Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Categorical Exclusion Without Written Decision
Decision Decided Date: 05/22/2018
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Snoqualmie Ranger District
States:
Washington
Counties:
Pierce
Legal Land Description:
T 20 N, R 11 E, S 4; Willamette Meridian, Pierce Co., WA
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Felix Nishida
902 S.E. North Bend Way, Bldg 1
North Bend, WA 98045
425-783-6081
comments-pacificnorthwest-mtbaker-snoqualmie@fs.fed.us
Last Updated: 5/29/2018