Skip to main content

US 2 Slope Stabilization

Permit WSDOT to stabilize the highway cut and fill slope on three segments of US Highway 2, west of the summit at Stevens Pass (mile post 61,1-64.1).

Project Summary

Last Updated: 4/5/2012