USGS Glacier Peak Wilderness Seismic Station Repair and Geologic Sampling
Authorize USGS to replace batteries via helicopter in GPW in August of 2018. Transportation of materials to be done via helicopter sling load. Geologic sampling would be done in same load and flight as battery replacement.
Project Summary
Location Summary:
On ridgeline just south of Scimitar Glacier, west flank of Glacier Peak, Lat: 48.117899 Lon: -121.737062
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/19/2018 |
Decision | 08/2018 (Estimated) |
Implementation | 09/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (8), 36 Cfr 220.6(D)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Darrington Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations; Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Categorical Exclusion Without Written Decision
Decision Decided Date: 08/29/2018
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Darrington Ranger District
States:
Washington
Counties:
Snohomish
Legal Land Description:
N1/2 NW 1/4 Sec 8. T.30N, R.13E, W.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Eric Ozog
1405 Emens Avenue North
Darrington, WA 98241
360-691-4396
eozog@fs.fed.us
Last Updated: 8/29/2018