Puget Sound Energy Upper Baker Spillway Staging Area and Barge Access Pad
Clear vegetation and level a construction area and barge access pad within the Baker River Hydroelectric Project license area, 1,300 feet downstream of Upper Baker Dam. The staging area and barge pad would occupy an approx. 0.90 area area.
Project Summary
Location Summary:
Adjacent to Baker River, between Upper Baker Dam and Baker Lake Fish Hatchery.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/18/2023 |
| Decision | 03/2024 (Estimated) |
| Implementation | 07/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
40 Cfr 1506.3(D)
Special Authority:
Nepa Document Prepared By Another Federal Agency
Lead Management Unit:
Mt Baker Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Hydropower; Special Use Authorizations; Road Maintenance
Current Status:
Cancelled
Forests:
Mt Baker-Snoqualmie National Forest
Districts:
Mt Baker Ranger District
States:
Washington
Counties:
Skagit
Legal Land Description:
Portions of NE1/4 SE1/4 Section 36, T.37 N., R.8 E., W.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Eric Ozog
810 State Route 20
Sedro-Woolley, WA 98294
360-691-4396
eric.ozog@usda.gov
Last Updated: 5/7/2024