Skip to main content

RF-38 Test Drilling

Red Flat Nickel Corp. plans to drill 35 3-inch diameter holes to a depth of 50 feet to obtain core samples of minerals adjacent to existing roads. No new roads would be constructed. About 1200 feet of road would be brushed.

Project Summary

Last Updated: 10/20/2017