Skip to main content

Applegate Trail Reroute

DaKuBeTeDe trail, west side of Applegate lake needs to be rerouted. Total reroutes would be approximately 200%u2019 in length and would follow Forest Service Trail Design Parameters for a class 2 trail with a tread width of approximately 24 inches.

Project Summary

Last Updated: 11/2/2018