Fitzgerald Water Transmission
Re-issuing this permit would allow the continued use and existence of a spring box development and approximately 302 ft of pipeline at Death Peak Springs. This also includes a 10%u2019 wide right-of-way for maintenance and access.
Project Summary
Current Status:
Completed
Location Summary:
Approximately ¬¬30 aerial miles south of Heppner, and consist of .06 acres. This area is within the Heppner Ranger District (Umatilla National Forest),
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/16/2014 |
| Decision | 08/2014 (Estimated) |
| Implementation | 12/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Heppner Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Project Decision Information
Fitzgerald Water Transmission
Decision Signed Date: 08/14/2014
Forests:
Umatilla National Forest
Districts:
Heppner Ranger District
States:
Oregon
Counties:
Umatilla
Legal Land Description:
T. 7., R. 26., Sec. 35 of the Willamette Principle Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christine Helberg
P.O. Box 7
Heppner, OR 97836
541-427-5351
chelberg@fs.fed.us
Last Updated: 12/10/2019