Verizon Propane Tank Replacement Special Use Permit Project
Project proposes the issuance of an amended special use permit to Verizon Wireless for the installation of a 12,000 gallon propane tank and associated structures at the existing cell phone site located at Ski Bluewood.
Project Summary
Location Summary:
Ski Bluewood
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/22/2012 |
Comment Period | 06/22/2012 |
Decision | 08/2012 (Estimated) |
Implementation | 08/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Walla Walla Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Verizon Propane Tank Replacement Project
Decision Signed Date: 08/06/2012
Legal Notice Date: 08/16/2012
Forests:
Umatilla National Forest
Districts:
Walla Walla Ranger District
States:
Washington
Counties:
Columbia
Legal Land Description:
T7N., R40E., Section 19 NW/SE
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jeff Bloom
1415 West Rose St.
Walla Walla, WA 99362
509-522-6277
jhbloom@fs.fed.us
Last Updated: 8/21/2012