Tiger-Webb Fuels Reduction Project
Project would have reduced vertical and horizontal fuel loading and continuity to modify potential fire behavior and approach or attain the desired objectives near and along the 6511 roads and MFTPs. Activities proposed were thinning and burning.
Project Summary
Location Summary:
The project area is approximately 9,550 acres in size and is within the Tiger and Webb Creek drainages of the Middle Mill Creek and North Fork Walla Walla River subwatersheds, on Forest Road 65.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/18/2014 |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Walla Walla Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Fuels Management
Project Activity:
Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
Current Status:
Cancelled
Forests:
Umatilla National Forest
Districts:
Walla Walla Ranger District
States:
Oregon
Counties:
Umatilla
Legal Land Description:
Township 5 North, Range 38 East, Sections 1, 2, 3, 4, 9, 10, 11; and Township 6 North, Range 38 East, Sections 20, 21, 27, 28, 29, 30, 32, 33, 34, 35
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Darcy Weseman
1415 West Rose St.
Walla Walla, WA 99362
541-523-1302
deweseman@fs.fed.us
Last Updated: 7/20/2017