Skip to main content

55 Road Repair Project

An approximately 25 foot portion of the 55 Road shoulder failed during above average precipitation, resulting in a public safety hazard. The proposed action will widen the existing road by excavating into the hillslope approximately 8 to 10 feet.

Project Summary

Last Updated: 3/13/2025